书籍详情
水利水电工程机电设计技术规范(英文版)
作者:中华人民共和国水利部 编
出版社:中国水利水电出版社
出版时间:2015-12-01
ISBN:9787517038986
定价:¥236.00
购买这本书可以去
内容简介
Department of International Cooperation, Science and Technology of Ministry of Water Resources, P. R. China has the mandate of managing the formulation and revision of water technology standards in China.Translation of this specification from Chinese to English was organized by Department of International Cooperation, Science and Technology of Ministry of Water Resources, P.R. China in accordance with due procedures and regulations applicable in the country.
作者简介
暂缺《水利水电工程机电设计技术规范(英文版)》作者简介
目录
Introduction to English Version
Foreword
1 General Provisions
2 Hydraulic Machinery
2.1 Selection of Turbine
2.2 Selection of Pump
2.3 Selection of Inlet/Outlet Valve
2.4 Control System and Regulation Guarantee of Turbine
2.5 Hydraulic Transition of Pumping Station
2.6 Cranes in Main Powerhouse
2.7 Auxiliary Equipment of the Water Conveyance System
2.8 Technical Water Supply and Drainage System and Fire—fighting Water Supply System
2.9 CompressedAirSystem
2.10 Oil System
2.11 Hydraulic Monitoring System of Hydropower Plant
2.12 Hydraulic Monitoring System of Pumping Station
3 Primary Electric
3.1 Connection of Hydropower Plant/Pumping Station to Power Grid
3.2 Main Electrical Connection
3.3 Hydrogenerator
3.4 Motor
3.5 Main Transformer
3.6 High Voltage Switchgear
3.7 Auxiliary Power System for Hydropower Plant/Pumping Station
3.8 Sluice Power Supply
3.9 Overvoltage Protection and Grounding
3.10 Lighting
3.11 Type Selection and Laying of Power Cable
4 Secondary Electric
4.1 General Requirements
4.2 Plant/station Centralized Supervision and Control
4.3 Automatic Control
4.4 Excitation System
4.5 Supervisory Control and Data Acquisition System (SCADA)
4.6 Relay Protection and System Safety Automatic Devices
4.7 Electrical Measurement and Electrical Energy Measurement
4.8 Electrical Secondary Wiring
4.9 Plant/Station DC Power Supply System
4.10 Automatic Fire Alarm and Fire—fighting Control System
4.11 Video Surveillance System
4.12 On—line Monitoring System
5 Communication
5.1 Production Management Communication
5.2 Dispatching Communication
6 E&M Equipment Arrangement and Requirements for Relevant Specialty
6.1 General Requirements
6.2 Main Powerhouse
6.3 Auxiliary Powerhouse
6.4 Main Transformer
6.5 High Voltage Switchgear
6.6 Central Control Room
6.7 Other Auxiliary Room
6.8 Diversion System in a Hydropower Plant
6.9 Water Conveyance System in Pumping Station
6.10 Elevator
7 Auxiliary Facilities
7.1 Workshop
7.2 Electrical Laboratory
Explanation of Wording
Foreword
1 General Provisions
2 Hydraulic Machinery
2.1 Selection of Turbine
2.2 Selection of Pump
2.3 Selection of Inlet/Outlet Valve
2.4 Control System and Regulation Guarantee of Turbine
2.5 Hydraulic Transition of Pumping Station
2.6 Cranes in Main Powerhouse
2.7 Auxiliary Equipment of the Water Conveyance System
2.8 Technical Water Supply and Drainage System and Fire—fighting Water Supply System
2.9 CompressedAirSystem
2.10 Oil System
2.11 Hydraulic Monitoring System of Hydropower Plant
2.12 Hydraulic Monitoring System of Pumping Station
3 Primary Electric
3.1 Connection of Hydropower Plant/Pumping Station to Power Grid
3.2 Main Electrical Connection
3.3 Hydrogenerator
3.4 Motor
3.5 Main Transformer
3.6 High Voltage Switchgear
3.7 Auxiliary Power System for Hydropower Plant/Pumping Station
3.8 Sluice Power Supply
3.9 Overvoltage Protection and Grounding
3.10 Lighting
3.11 Type Selection and Laying of Power Cable
4 Secondary Electric
4.1 General Requirements
4.2 Plant/station Centralized Supervision and Control
4.3 Automatic Control
4.4 Excitation System
4.5 Supervisory Control and Data Acquisition System (SCADA)
4.6 Relay Protection and System Safety Automatic Devices
4.7 Electrical Measurement and Electrical Energy Measurement
4.8 Electrical Secondary Wiring
4.9 Plant/Station DC Power Supply System
4.10 Automatic Fire Alarm and Fire—fighting Control System
4.11 Video Surveillance System
4.12 On—line Monitoring System
5 Communication
5.1 Production Management Communication
5.2 Dispatching Communication
6 E&M Equipment Arrangement and Requirements for Relevant Specialty
6.1 General Requirements
6.2 Main Powerhouse
6.3 Auxiliary Powerhouse
6.4 Main Transformer
6.5 High Voltage Switchgear
6.6 Central Control Room
6.7 Other Auxiliary Room
6.8 Diversion System in a Hydropower Plant
6.9 Water Conveyance System in Pumping Station
6.10 Elevator
7 Auxiliary Facilities
7.1 Workshop
7.2 Electrical Laboratory
Explanation of Wording
猜您喜欢