书籍详情
高速铁路桥涵工程施工技术规程(Q\CR9603-2015 英文版)
作者:中国铁路总公司
出版社:中国铁道出版社
出版时间:2016-04-01
ISBN:9787113213299
定价:¥1250.00
购买这本书可以去
内容简介
This specification is formulated with a view to guiding the construction of high-speed railway bridge and culvert,unifying major technical requirements,strengthening construction management,and ensuring construction quality.This specification is applicable to the construction of bridge and culvert of high-speed railways and shall be referred to for the construction of bridge and culvert of intercity railways.Construction of higlrspeed railway bridge and culvert must comply with national laws,regulations and relevant technical standards, strictly conform to design documents, meet the requirements for safety,durability and system application function of engineering structures, and ensure normal operation during designed service life.All parties involved in the construction shall standardize the management system,manning, field management, and process control, etc.and achieve such construction management targets as quality,safety9 construction period,investment,and environmental protectionMechanized construction,me:mber prefabrication in plant,specialized construction and information- aided construction shall be initiatively utilized.On-site management shall be strengthened,site layout shall be standardized9 and HSE(Health, Safety and Environment)management shall be enhanced. Planning and design of beam fabrication yards and concrete batching plants,etc. shall comply with the principle of land saving,investment saving, environmental protection and energy saving, combination of permanent and temporary works, and reasonable application.During the construction of high-speed railway bridge and culvert,relevant information concerning weather,hydrology,and geological disaster etc. shall be mastered in time and attentions shall be paid to identification and evaluation,planning and prevention,monitoring and emergency response,as well as engineering treatment against natural disasters so as to minimize such disasters and their impacts.Construction of high-speed railway bridge and culvert works shall be on the basis of the protection measures specified in the scheme and design approved by the cultural relic protection adnunistrative department,if cultural relic protection organizations and other cultural relic sites are involved.Construction of high-speed railway bridge and culvert shall strictly comply with relevant national laws, regulations and technical standards on resource saving, energy saving and emission reduction,and the technical measures for energy saving and emission reduction shall be formulated and implemented,taking into account engineering characteristics and construction environment.Construction staff for high-speed railway bridge and culvert shall receive professional training and pass examination before assuming the post.The collection and preparation of construction data for high-speed railway bridge and culvert shall be carried out in parallel with the construction progress so as to obtain systematic,integral,true and precise data, and ensure its availability for reference and tracing of quality responsibility. Moreover,archiving and management of data shall be made in time according to relevant requirements.
作者简介
暂缺《高速铁路桥涵工程施工技术规程(Q\CR9603-2015 英文版)》作者简介
目录
1 GeneralProvisions
2 Terms
3 Basic Requirements
3.1 General Requirements
3.2 Client
3.3 Survey and Design Institute
3.4 Contractor
3.5 Supervision Firm
4 Construction Preparation
4.1 Construction Investigation
4.2 Field Check of Design Documents
4.3 Selection of Construction Plan and Major Construction Equipment
4.4 Construction Operation Instruction
4.5 Construction Technical Explanation
4.6 Temporary Works
5 Construction Survey
5.1 General Requirements
5.2 Construction Resurvey
5.3 Construction ControlNetwork Survey
5.4 Setting Out
5.5 As-built Survey
5.6 Observation of Settlement Deformation
6 OpenCutFoundation
6.1 General Requirements
6.2 Foundation Pit Excavation
6.3 Foundation Pit Cofferdam
6.4 Foundation Pit Dewatering and Drainage
6.5 Foundation Base Treatment
6.6 Concrete Foundation
6.7 Foundation Pit Backfilling
7 Pile Foundation
7.1 General Requirements
7, 2 Driven Pile
7.3 Bored Pile
7.4 Bored Pile in Karst Region
7.5 Cofferdam,
7.6 Pile Cap
8 Open Caisson Foundation
8.1 GeneralRequirements
8.2 Open Caisson Fabrication
8.3 Open Caisson Sinking and Heightening
8.4 Cleaning,Bottom-sealing and Filling of Open Caisson's Foundation Base
9 Pier and Abutment
9.1 GeneralRequirements
9.2 Pier and Abutment Form
9.3 PierandAbutmentConcrete
9.4 Conic Pitching
9.5 Abutment Drainage and Protection
10 Prefabrication and Erection of Prestressed Concrete Simply Supported Box Beam
10.1 GeneraIRequirements
10.2 Prefabrication of Prestressed Concrete Snnply Supported Box Beam by Post-tensioning Method
10.3 Prefabrication of Prestressed Concrete Simply Supported Box Beam by Pre-tensioningMethod
10.4 Erection of Prestressed Concrete Simply Supported Box Beam
11 Prefabrication and Erection of Prestressed Concrete Simply Supported T Beam
11.1 GeneralRequirements
11.2 PrefabricationofT:Beam
11.3Erection of T Beam
12 Fabrication of Prestressed Concrete Simply Supported Beam at Bridge Site
12.1 GeneralRequirements
12.2 Beam Fabrication by Scaffolding Method
12.3 Beam Fabrication by Movable Scaffolding System(MSS)
12.4 Beam Fabrication with Span by Span Method
13 Concrete Continuous Beam and Continuous Rigid Frame
13.1 GeneralRequirements
13.2 Cantilever Concreting of Continuous Beam and Continuous Rigid Frame
13.3 Cantilever Assembly of Continuous Beam and Continuous Rigid Frame
13.4 Continuous Beam Constructed by Incremental Launching
13.5 Erection of Continuous Beam and Continuous Rigid Frame by Swing Method
13, 6 Cast-in-situ Contmuous Beam by Scaffolding Method
13.7 Reinforced Concrete Continuous Rigid Frame Bridge
14 Arch Bridge
14.1 General Requirements
15 Erection of Steel Trussed Girder
16 Composite Girder
17 Cable-stayed Bridge
18 Culvert
19 Waterproof and Protection Layers
20 Bridge Bearing
21 Auxiliary Facilities of Bridge Deck
22 Environmental Protection & Water and Soil Conservation
23 Acceptance of Works
Explanation of Wording in this Specification
2 Terms
3 Basic Requirements
3.1 General Requirements
3.2 Client
3.3 Survey and Design Institute
3.4 Contractor
3.5 Supervision Firm
4 Construction Preparation
4.1 Construction Investigation
4.2 Field Check of Design Documents
4.3 Selection of Construction Plan and Major Construction Equipment
4.4 Construction Operation Instruction
4.5 Construction Technical Explanation
4.6 Temporary Works
5 Construction Survey
5.1 General Requirements
5.2 Construction Resurvey
5.3 Construction ControlNetwork Survey
5.4 Setting Out
5.5 As-built Survey
5.6 Observation of Settlement Deformation
6 OpenCutFoundation
6.1 General Requirements
6.2 Foundation Pit Excavation
6.3 Foundation Pit Cofferdam
6.4 Foundation Pit Dewatering and Drainage
6.5 Foundation Base Treatment
6.6 Concrete Foundation
6.7 Foundation Pit Backfilling
7 Pile Foundation
7.1 General Requirements
7, 2 Driven Pile
7.3 Bored Pile
7.4 Bored Pile in Karst Region
7.5 Cofferdam,
7.6 Pile Cap
8 Open Caisson Foundation
8.1 GeneralRequirements
8.2 Open Caisson Fabrication
8.3 Open Caisson Sinking and Heightening
8.4 Cleaning,Bottom-sealing and Filling of Open Caisson's Foundation Base
9 Pier and Abutment
9.1 GeneralRequirements
9.2 Pier and Abutment Form
9.3 PierandAbutmentConcrete
9.4 Conic Pitching
9.5 Abutment Drainage and Protection
10 Prefabrication and Erection of Prestressed Concrete Simply Supported Box Beam
10.1 GeneraIRequirements
10.2 Prefabrication of Prestressed Concrete Snnply Supported Box Beam by Post-tensioning Method
10.3 Prefabrication of Prestressed Concrete Simply Supported Box Beam by Pre-tensioningMethod
10.4 Erection of Prestressed Concrete Simply Supported Box Beam
11 Prefabrication and Erection of Prestressed Concrete Simply Supported T Beam
11.1 GeneralRequirements
11.2 PrefabricationofT:Beam
11.3Erection of T Beam
12 Fabrication of Prestressed Concrete Simply Supported Beam at Bridge Site
12.1 GeneralRequirements
12.2 Beam Fabrication by Scaffolding Method
12.3 Beam Fabrication by Movable Scaffolding System(MSS)
12.4 Beam Fabrication with Span by Span Method
13 Concrete Continuous Beam and Continuous Rigid Frame
13.1 GeneralRequirements
13.2 Cantilever Concreting of Continuous Beam and Continuous Rigid Frame
13.3 Cantilever Assembly of Continuous Beam and Continuous Rigid Frame
13.4 Continuous Beam Constructed by Incremental Launching
13.5 Erection of Continuous Beam and Continuous Rigid Frame by Swing Method
13, 6 Cast-in-situ Contmuous Beam by Scaffolding Method
13.7 Reinforced Concrete Continuous Rigid Frame Bridge
14 Arch Bridge
14.1 General Requirements
15 Erection of Steel Trussed Girder
16 Composite Girder
17 Cable-stayed Bridge
18 Culvert
19 Waterproof and Protection Layers
20 Bridge Bearing
21 Auxiliary Facilities of Bridge Deck
22 Environmental Protection & Water and Soil Conservation
23 Acceptance of Works
Explanation of Wording in this Specification
猜您喜欢