书籍详情
城市轨道交通信号工程施工质量验收规范GB50578-2010(英文版)
作者:中华人民共和国住房和城乡建设部组织 编
出版社:中国建筑工业出版社
出版时间:2014-09-01
ISBN:9787112169863
定价:¥600.00
购买这本书可以去
内容简介
《城市轨道交通信号工程施工质量验收规范 GB50578-2010(英文版)》,本书是《城市轨道交通信号工程施工质量验收规范》GB50578-2010的英文版。主要技术内容是:总则、术语、基本规定、电(光)缆线路、固定信号机、发车指示器及按钮装置、转辙设备、列车检测与车地通信设备、车载设备、防雷及接地、试车线设备、室外设备标识及硬面化、联锁、微机监测、列车自动防护、列车自动运行、列车自动控制、单位工程观感质量。
作者简介
暂缺《城市轨道交通信号工程施工质量验收规范GB50578-2010(英文版)》作者简介
目录
1 General Provisions
2 Terms
3 Basic Requirement
3.1 General Requirements
3.2 Classification of Quality Acceptance of Signaling Engineering Works
3.3 Quality Acceptance of Signaling Engineering Works
4 Electrical (Optical) Cable Lines
4.1 General Requirements
4.2 Cable Bracket and Cable Tray Installation
4.3 Electrical (Optical) Cable Laying
4.4 Electrical (Optical) Cable Protection
4.5 Electrical (Optical) Cable Splicing
4.6 Installation of Case and Box
5 Fixed Signal, Train Departure Indicator and Button Device
5.1 General Requirements
1 General Provisions
2 Terms
3 Basic Requirement
3.1 General Requirements
3.2 Classification of Quality Acceptance of Signaling Engineering Works
3.3 Quality Acceptance of Signaling Engineering Works
4 Electrical (Optical) Cable Lines
4.1 General Requirements
4.2 Cable Bracket and Cable Tray Installation
4.3 Electrical (Optical) Cable Laying
4.4 Electrical (Optical) Cable Protection
4.5 Electrical (Optical) Cable Splicing
4.6 Installation of Case and Box
5 Fixed Signal, Train Departure Indicator and Button Device
5.1 General Requirements
5.2 High Signal Installation
5.3 Dwarf Signal Installation
5.4 Non-standard Signal Installation
5.5 Train Departure Indicator Installation
5.6 Button Device Installation
6 Switching Equipment
6.1 General Requirements
6.2 Installation of Installation Devices
6.3 External Locking Device Installation
6.4 Switch Machine Installation
7 Train Detection and Train Wayside Communication
7.1 General Requirement
7.2 Installation of Rail Insulated Joint Track Circuit
7.3 Installation of Jointless Track Circuit
7.4 Impedance Connector Installation
7.5 Loop Installation
7.6 Waveguide Installation
7.7 Leaky Coaxial Cable Installation
7.8 Balise Installation
7.9 Positioning Antenna Installation
7.10 Terminal Receiver Installation
7.11 Radio Access Unit Installation
7.12 Axle Counter Installation
8 Onboard Equipment
8.1 General Requirements
8.2 Cabinet, Equipment and Man machine Interface Installation
8.3 Installation of Antenna and Speed Measurement Device
8.4 Wiring
9 Indoor Equipment
9.1 General Requirements
9.2 Cabinet (Rack) Installation
9.3 Cabling Rack (Tray) Installation
9.4 Electrical (Optical) Cable Lead-in and Installation
9.5 Operation and Display Equipment Installation
9.6 Large Screen Display Equipment Installation
9.7 Power Supply Equipment Installation
9.8 Wiring
10 Lightning Protection and Earthing
10.1 General Requirements
10.2 Lightning Protection Device Installation
10.3 Earthing Device Installation
11 Equipment for Testing Track
11.1 General Requirements
11.2 Installation
11.3 System Function Test
12 Marking and Reinforcement of Outdoor Signaling Equipment
12.1 General Requirements
12.2 Equipment Marking
12.3 Reinforcement
13 Interlocking
13.1 General Requirements
13.2 Indoor Single Item Test
13.3 Outdoor Single Item Test
13.4 Integrated Test
14 Computer Monitoring
14.1 General Requirements
14.2 Function and Performance Test of Computer Monitoring Equipment
15 Automatic Train Protection
15.1 General Requirements
15.2 ATP System Function Inspection
16 Automatic Train Supervision
16.1 General Requirements
16.2 ATS System Function Inspection
17 Automatic Train Operation
17.1 General Requirements
17.2 ATO System Function Inspection
18 Automatic Train Control
18.1 General Requirements
18.2 ATC System Function Inspection
19 Quality of Appearance of Unit Works
19.1 General Requirements
19.2 Electrical (Optical) Cable Line
19.3 Outdoor Equipment
19.4 Onboard Equipment
19.5 Indoor Equipment
Appendix A Inspection Records of Quality Management of Construction Site
Appendix B Quality Acceptance Records of Inspection Lot
Appendix C Quality Acceptance Records of Subdivisional Works
Appendix D Quality Acceptance Records of Divisional Works
Appendix E Completion Quality Acceptance Records of Unit Works
Explanationsof Wording in This Code
List of Quoted Standards
2 Terms
3 Basic Requirement
3.1 General Requirements
3.2 Classification of Quality Acceptance of Signaling Engineering Works
3.3 Quality Acceptance of Signaling Engineering Works
4 Electrical (Optical) Cable Lines
4.1 General Requirements
4.2 Cable Bracket and Cable Tray Installation
4.3 Electrical (Optical) Cable Laying
4.4 Electrical (Optical) Cable Protection
4.5 Electrical (Optical) Cable Splicing
4.6 Installation of Case and Box
5 Fixed Signal, Train Departure Indicator and Button Device
5.1 General Requirements
1 General Provisions
2 Terms
3 Basic Requirement
3.1 General Requirements
3.2 Classification of Quality Acceptance of Signaling Engineering Works
3.3 Quality Acceptance of Signaling Engineering Works
4 Electrical (Optical) Cable Lines
4.1 General Requirements
4.2 Cable Bracket and Cable Tray Installation
4.3 Electrical (Optical) Cable Laying
4.4 Electrical (Optical) Cable Protection
4.5 Electrical (Optical) Cable Splicing
4.6 Installation of Case and Box
5 Fixed Signal, Train Departure Indicator and Button Device
5.1 General Requirements
5.2 High Signal Installation
5.3 Dwarf Signal Installation
5.4 Non-standard Signal Installation
5.5 Train Departure Indicator Installation
5.6 Button Device Installation
6 Switching Equipment
6.1 General Requirements
6.2 Installation of Installation Devices
6.3 External Locking Device Installation
6.4 Switch Machine Installation
7 Train Detection and Train Wayside Communication
7.1 General Requirement
7.2 Installation of Rail Insulated Joint Track Circuit
7.3 Installation of Jointless Track Circuit
7.4 Impedance Connector Installation
7.5 Loop Installation
7.6 Waveguide Installation
7.7 Leaky Coaxial Cable Installation
7.8 Balise Installation
7.9 Positioning Antenna Installation
7.10 Terminal Receiver Installation
7.11 Radio Access Unit Installation
7.12 Axle Counter Installation
8 Onboard Equipment
8.1 General Requirements
8.2 Cabinet, Equipment and Man machine Interface Installation
8.3 Installation of Antenna and Speed Measurement Device
8.4 Wiring
9 Indoor Equipment
9.1 General Requirements
9.2 Cabinet (Rack) Installation
9.3 Cabling Rack (Tray) Installation
9.4 Electrical (Optical) Cable Lead-in and Installation
9.5 Operation and Display Equipment Installation
9.6 Large Screen Display Equipment Installation
9.7 Power Supply Equipment Installation
9.8 Wiring
10 Lightning Protection and Earthing
10.1 General Requirements
10.2 Lightning Protection Device Installation
10.3 Earthing Device Installation
11 Equipment for Testing Track
11.1 General Requirements
11.2 Installation
11.3 System Function Test
12 Marking and Reinforcement of Outdoor Signaling Equipment
12.1 General Requirements
12.2 Equipment Marking
12.3 Reinforcement
13 Interlocking
13.1 General Requirements
13.2 Indoor Single Item Test
13.3 Outdoor Single Item Test
13.4 Integrated Test
14 Computer Monitoring
14.1 General Requirements
14.2 Function and Performance Test of Computer Monitoring Equipment
15 Automatic Train Protection
15.1 General Requirements
15.2 ATP System Function Inspection
16 Automatic Train Supervision
16.1 General Requirements
16.2 ATS System Function Inspection
17 Automatic Train Operation
17.1 General Requirements
17.2 ATO System Function Inspection
18 Automatic Train Control
18.1 General Requirements
18.2 ATC System Function Inspection
19 Quality of Appearance of Unit Works
19.1 General Requirements
19.2 Electrical (Optical) Cable Line
19.3 Outdoor Equipment
19.4 Onboard Equipment
19.5 Indoor Equipment
Appendix A Inspection Records of Quality Management of Construction Site
Appendix B Quality Acceptance Records of Inspection Lot
Appendix C Quality Acceptance Records of Subdivisional Works
Appendix D Quality Acceptance Records of Divisional Works
Appendix E Completion Quality Acceptance Records of Unit Works
Explanationsof Wording in This Code
List of Quoted Standards
猜您喜欢