书籍详情
土建英语
作者:教育部《土建英语》教材编写组编
出版社:高等教育出版社
出版时间:2000-07-01
ISBN:9787040087833
定价:¥22.00
购买这本书可以去
内容简介
专门用途英语系列教材是教育部规划的高等学校(包括高等专科院校和高等职业学校)专业英语阶段的英语教材,也可供电大、各类成人院校及广大专业人员学习专业英语、提高涉外业务交际能力使用。《土建英语》是该系列教材之一。本书从专业人员实际工作的需要出发进行设计和编写。选材新颖、点面结合、内容丰富、语言规范;练习兼具实用性和针对性。全书由10个单元组成,每单元包括专业文献阅读与翻译、涉外业务应用文模拟套写和听力与会话三部分。书后附有词汇表、练习参考答案和课文参考译文。本书配有录音带。
作者简介
暂缺《土建英语》作者简介
目录
Unit 1 DesignProcess
Part Ⅰ Illustrated Words and Expressions: Architecture Design
Part Ⅱ Reading and Translating
Passage A: Introduction to DesignProcess
Passage B: The London Millennium Tower
Part Ⅲ Simulated Writing: Advertisement (1)
Part Ⅳ Listening and Speaking: Arranging a Meeting
Unit 2 Foundation
Part Ⅰ Illustrated Words and Expressions: Stairs and Steps
Part Ⅱ Reading andTranslating.
Passage A: Foundation Construction
Passage B: Rethinking District Heating in Germany
Part Ⅲ Simulated Writing: Advertisement (2)
Part Ⅳ Listening anti Speaking: Discussion of aProject at a PreliminaryPhase
Unit 3 Walling
Part Ⅰ Illustrated Words and Expressionsi Window Detail
Part Ⅱ Reading and Translating
Passage A: Solid Walling andPartition Walling
Passage B: Hong Kong Shanghai Bank
Part Ⅲ Simulated Writing: Advertisement (3)
Part Ⅳ Listening and Speaking: Talks Between the Owner and the Program Manager
Unit 4 Floors
Part Ⅰ Illustrated Words anti Expressions: Sheet Metal Work
Part Ⅱ Reading anti Translating
Passage A: Solid Floors and Timber Floors
Passage B: Nullifire System S
Part Ⅲ Simulated Writing:Product Instruction
Part Ⅳ Listening and Speaking: Site Inspection
Unit 5 Roofs
Part Ⅰ Illustrated Words and Expressions: Roof Structure
Part Ⅱ Reading and Translating
Passage A: Roof Construction
Passage B: Computer Applications in Construction
Part Ⅲ Simulated Writing:Performance Security (Bank Guarantee)
Part Ⅳ Listening and Speaking: Bidding
Unit 6 Prefabrication
Part Ⅰ Illustrated Words and Expressions: Methods of Jointing
Part Ⅱ Reading and Translating
Passage A:Prefabricated Construction
Passage B: A High-efficiency and Energy-saving Wastewater Treatment Technique
Part Ⅲ Simulated Writing: Subcontract Agreement
Part Ⅲ Listening and Speaking: Field Management
Unit 7 Tunnels
Part Ⅰ Illustrated Words and Expressions: Brick Structures
Part Ⅱ Reading and Translating
Passage A: Traffic Tunnel Construction
Passage B: Drawings
Part Ⅲ Simulated Writing: E-mail
Part Ⅳ Listening and Speaking: Claims and Back-charges
Unit 8 Roads
Part Ⅰ Illustrated Words and Expressions: Building Machinery
Part Ⅱ Reading and Translating
Passage A: Modem Road
Passage B: Cost Variance inProject
Part Ⅲ Simulated Writing: Fax Message
Part Ⅳ Listening and Speaking: Construction Schedule
Unit 9 Rridges
Part Ⅰ Illustrated Words and Expressions: Steel Structures Reading and Translating
Part ⅡPassage A: Fleher Cable-stayed Suspension Bridge in Get~x~any
Passage B: Role of Specification in Construction
Part Ⅲ Simulated Writing: Contract Agreement
Part Ⅳ Listening and Speaking: Talks on Value-engineering
Unit 10 Sewage Disposal
Part Ⅰ Illustrated words and Expressions: Bricklayers Tools Reading and Translating
Part Ⅱ Passage A: Efficient Sewage Disposal
Passage B: Letter of Acceptance
Part Ⅲ Simulated Writing: Invitation for Bids
Part Ⅳ Listening and Speaking: Quality Control
Part Ⅰ Illustrated Words and Expressions: Architecture Design
Part Ⅱ Reading and Translating
Passage A: Introduction to DesignProcess
Passage B: The London Millennium Tower
Part Ⅲ Simulated Writing: Advertisement (1)
Part Ⅳ Listening and Speaking: Arranging a Meeting
Unit 2 Foundation
Part Ⅰ Illustrated Words and Expressions: Stairs and Steps
Part Ⅱ Reading andTranslating.
Passage A: Foundation Construction
Passage B: Rethinking District Heating in Germany
Part Ⅲ Simulated Writing: Advertisement (2)
Part Ⅳ Listening anti Speaking: Discussion of aProject at a PreliminaryPhase
Unit 3 Walling
Part Ⅰ Illustrated Words and Expressionsi Window Detail
Part Ⅱ Reading and Translating
Passage A: Solid Walling andPartition Walling
Passage B: Hong Kong Shanghai Bank
Part Ⅲ Simulated Writing: Advertisement (3)
Part Ⅳ Listening and Speaking: Talks Between the Owner and the Program Manager
Unit 4 Floors
Part Ⅰ Illustrated Words anti Expressions: Sheet Metal Work
Part Ⅱ Reading anti Translating
Passage A: Solid Floors and Timber Floors
Passage B: Nullifire System S
Part Ⅲ Simulated Writing:Product Instruction
Part Ⅳ Listening and Speaking: Site Inspection
Unit 5 Roofs
Part Ⅰ Illustrated Words and Expressions: Roof Structure
Part Ⅱ Reading and Translating
Passage A: Roof Construction
Passage B: Computer Applications in Construction
Part Ⅲ Simulated Writing:Performance Security (Bank Guarantee)
Part Ⅳ Listening and Speaking: Bidding
Unit 6 Prefabrication
Part Ⅰ Illustrated Words and Expressions: Methods of Jointing
Part Ⅱ Reading and Translating
Passage A:Prefabricated Construction
Passage B: A High-efficiency and Energy-saving Wastewater Treatment Technique
Part Ⅲ Simulated Writing: Subcontract Agreement
Part Ⅲ Listening and Speaking: Field Management
Unit 7 Tunnels
Part Ⅰ Illustrated Words and Expressions: Brick Structures
Part Ⅱ Reading and Translating
Passage A: Traffic Tunnel Construction
Passage B: Drawings
Part Ⅲ Simulated Writing: E-mail
Part Ⅳ Listening and Speaking: Claims and Back-charges
Unit 8 Roads
Part Ⅰ Illustrated Words and Expressions: Building Machinery
Part Ⅱ Reading and Translating
Passage A: Modem Road
Passage B: Cost Variance inProject
Part Ⅲ Simulated Writing: Fax Message
Part Ⅳ Listening and Speaking: Construction Schedule
Unit 9 Rridges
Part Ⅰ Illustrated Words and Expressions: Steel Structures Reading and Translating
Part ⅡPassage A: Fleher Cable-stayed Suspension Bridge in Get~x~any
Passage B: Role of Specification in Construction
Part Ⅲ Simulated Writing: Contract Agreement
Part Ⅳ Listening and Speaking: Talks on Value-engineering
Unit 10 Sewage Disposal
Part Ⅰ Illustrated words and Expressions: Bricklayers Tools Reading and Translating
Part Ⅱ Passage A: Efficient Sewage Disposal
Passage B: Letter of Acceptance
Part Ⅲ Simulated Writing: Invitation for Bids
Part Ⅳ Listening and Speaking: Quality Control
猜您喜欢